f
TAGS
H

How to build a glass Furnace

The dome is complete

Rebecca and Diane helped me complete the final layer of lightweight castable refractory yesterday. Ready to start up tomorrow. The following image shows the: 1800 dome with the polystyrene former removed from inside and out, the 1400 fibre blanket in place and covered with chicken wire to hold it in place and the final layer of lightweight insulating castable. I leave the light running inside to help dry out the castable refractory and run a fan heater placed in the gathering port when I am in the studio.



 

This product has been added to your cart

CHECKOUT